Urbanise platform update

Do more with job duration

Agents can specify an estimated job duration (aka. wrench time) which represents the effort required to complete a planned job. The estimated duration can also be re-specified at the time of creating asset or location job plans.

job-duration-plan1

Using the Operations Planner, agents can visibly manage and plan maintenance work (jobs) as the Planner now reports the duration of work for a day/week.

planner-duration

A single job for multiple assets or areas

It is possible to create location/asset reactive and planned jobs so that a job references multiple areas/assets. Useful for soft services such as cleaning, it often makes sense to raise jobs for a collection or areas to clean, thus reducing the number of jobs your staff need to manage in the field.

job-per-area

Showing a regular job plan where the generated jobs can reference more than one asset.

job-duration-plan2

Job plan & work order wizards

When creating location and asset work orders (reactive jobs), agents can re-specify the job’s priority and contract/slow SLA times.

work-order

When creating location and asset job plans (planned jobs), agents can re-specify the job’s priority and estimated duration.  These parameters can also be changed at anytime during the life of the job plan.

job-duration-plan3

Raising jobs onsite

Field agents can raise new jobs from their current job within the Workforce application, and if applicable specifying area(s) or asset(s) for the new job.

force-choose-assets

Likewise, area(s) or asset(s) can be specified when raising a job from a work instruction’s checklist.  For example, the agent is checking or auditing a list of assets and requires another job that is related to the task they are checking.

New job plan importers

In order to speed up the creation of job plans, the Urbanise platform introduces two new job plan importers where agents can now import asset and location job plans.  The importers support the same functionality that is provided via the Operator portal job plan wizards.

Asset job plans

asset-plan-import

Location job plans

location-plan-import

Import new jobs

This update also introduces a new importer to rapidly upload Job Templates into the platform.

job-import

Specify the area of a location for callouts

Operators and customers can specify the location’s area when raising new callouts.

ops-callout-area

Job summaries support questionnaires and site survey data

Work instruction tasks can be treated solely to collect user input text, so that a task does not need to be scored or marked pass/fail.  The resultant order/job summary will report field agent comments, regardless of the task’s score or state.  This is useful for jobs that have questionnaires or for site survey forms where information is to be collected.

Upload evidence on work instruction tasks

Field agents can upload photos to a job’s work instruction tasks.  These are visible as supporting evidence on the order/job summary reports.

upload-checklist

Daily planned jobs

Daily location and asset job plans do not need to nominate a regular calendar appointment, instead agents specify the days of the week for the job and that’s it.

daily-job-plan

Other changes

  1. Operator agents can filter the list of work instructions

  2. New tag management screens to view, update and delete various tags, including asset, skill, location and area tags

  3. Mobile workforce appointments for “TOMORROW” expanded to show appointments for the “Next 7 days”